Status
Ordered
Products
Energy Prism (26 units, 11.7 MWh, on order); Energy Rack (150 kWh) for port terminals
Duty
Storing solar power at a production site for use in the evening and overnight
Site conditions
-20°C to +60°C; an established oil and gas production site in northern China
Evidence
In September 2026 a major Chinese oil and gas producer ordered 26 Energy Prism units, 11.7 MWh in total. The first units ship in December 2026.
Read the announcementAn oil or gas site adding solar panels needs a battery that meets its fire and process safety requirements beside flammable gas. A remote mine runs diesel generators around the clock, and most batteries need augmentation or replacement within the life of the mine. Container terminals are electrifying their equipment, and under Regulation (EU) 2023/1804 the larger EU ports must offer shore power from 2030, all on a grid connection that can take years to upgrade.
Market context
Energy typically accounts for 20 to 40 percent of a mining company's operating costs.
Source: International Energy Agency, commentary of March 25, 2026
View the sourceIn September 2026 a major Chinese oil and gas producer ordered 26 Energy Prism units, 11.7 MWh in total, for a production site in northern China, and safety was the deciding factor. The Aqueous Metal Cell (AMC) carries zero risk of fire from thermal runaway, is certified to UL 1973 and has passed UL 9540A with no fire propagation. It is designed for up to three full cycles a day for 30 years with no augmentation, and the Energy Prism ships fully assembled to an oilfield, a mine or a container terminal.
At an oil or gas site, stored solar power runs the evening and the night, so the generators run less, and the safety review deals with a battery that needs no fire suppression system. At a mine the generators become backup, and at a port the battery supplies the busiest hours, so the terminal may electrify on its existing connection. On every site the battery is designed to work every day for 30 years.
This page draws on EnerVenue's first multi-megawatt-hour order, announced on September 23, 2026, and on EnerVenue's product specifications. The first units ship in December 2026. The mining and port examples are illustrative and do not describe a specific EnerVenue customer or installation.

Join industry leaders who turn to our briefing for insights and analysis on storage technology, market shifts, and real-world deployments.
- Early access to industry research & whitepapers
- Market insights on energy storage trends
- Technology deep-dives from our engineering team
Born to Empower. Built to Endure.
Speak with an Advisor